Location: Munich, Germany
Customer: DTM / ITR
Planing: NORDBETON GmbH
System: NORDBETON FIA Racetrack Barrier, height 1,00m, Typ „BSW1001NORS“
Year: 2011/2012

FIA Racetrack Barrier for DTM event:

Situation

The assignment was to secure a race track in the historic Olympic Stadium in Munich, the competition results of which were to be included in the DTM classification (German Touring Car Masters) in 2012 in addition to the event character.

After the successful event in 2011, the elements were also used in 2012.

The challenge

The barrier was to be erected in two days.

Solution

A total of 1,500 metres of NORDBETON concrete safety barrier elements were brought to a temporary storage place and erected just in time. A leasing system is ideal for this application.