Location: Berlin, Germany
Customer: Formular E
Planing: NORDBETON GmbH
System:
Year:

Berlin ePrix 2015

Situation

The 100 per cent mobile race track barrier was to be erected under the eagle eyes of the Berlin monument protection authority on the site of the former Tempelhof airport. It was not permitted to change the airfield.

The challenge

The entire barrier had to be erected within four and a half days and removed within another four days. The use of securing anchors on the ground surface was also not permitted.


Solution

During detailed planning, GEOBRUGG was included in the planning team.

Together with NORDBETON, an optimum timetable with a production lead time of three months and delivery of the elements to a temporary storage site on the former Tempelhof airport was met.
It was therefore possible to carry out erection work in the scheduled four and a half days with a team of 30 GEOBRUGG and NORDBETON employees. It goes without saying that a GEOBRUGG and NORDBETON emergency team was at the site on the weekend of the race.